Ipsen, Dublin has awarded DPS the Front End Design for a new process building to contain a lyophilisation suite and fallow area for future development of a peptide purification suite.
Building 4 will be constructed within the boundary of the existing campus and will interface with existing site utilities.
New chilled water generation and emergency power generation will be installed to support the B4 operation.
The new facility provides a significant processing capacity increase for the site and is the latest phase of the ongoing site development program.
This project further builds on the relationship between Ipsen and DPS. This phase of the project will be completed in August 2015 with detailed design to commence thereafter.