Zoetis, New Fill Finish Building

The project goal was to build a new Fill Finish facility for the Zoetis Louvain-la-Neuve (LLN ) in Belgium to support additional vaccine production.

Location: Belgium
Sector: Biopharmaceutical

About This Project

Project Scope

For Zoetis Louvain-la-Neuve (LLN ) in Belgium has a strategic plan to be to become the primary vaccine supplier to EU/ANZ and regional Drug Product center of excellence (CoE). For this to occur, Zoetis needed to upgrade their fill finsh and freeze dry capacity to allow for addition vaccine production.

DPS engineered the facility to allow for the installation of a new Bosch filling line, a new autoclave and a new freeze dryer, including all related ancillaries (Clean and Black Utilities, HVAC, E&I and other building services).

Process and support systems included:

  1. Basic and Detailed design of all disciplines except architecture, superstructure & cladding.
  2. Integrated team with client resources for HVAC.
Back to top
DPS Group addresses the COVID-19 pandemic:
A message from Frank Keogh, CEO

Find out more Contact Us