BIM, Federated Model Management, Confidential Client

DPS is engaged as to manage the federated model on a 1.2 million sq.ft. solar photovoltaic (PV) manufacturing facility.

Location: New York
Sector: Advanced Technology Facilities

About This Project

DPS is engaged as to manage the federated model on a 1.2 million sq.ft. solar photovoltaic (PV) manufacturing facility. As the Federated Model Manager, DPS is responsible for facilitating the coordination between 9 contractors utilizing a single Navisworks® model. Contractor BIM (Building Information Modelling) models are submitted to DPS for approval. Once verified clash- free, constructible and design compliant by our team, the submittals then proceed to fabrication.

 

Process / Support Systems

  • UPW generation and distribution
  • Bulk chemicals and distribution
  • Spec gases
  • Bulk inert gases
  • Waste water treatment
  • Process exhaust
  • Life safety

Facility features

The largest residential solar PV installer in the US has made a $5 billion capital project investment to establish a

  • 1.2 million sq.ft. “Gigafactory” manufacturing plant.
  • 1.2 million sq.ft. ‘Clean Space’ Photovoltaic (PV) cells
Back to top