Advanced Technology Facilities

SORAA, LED manufacturing facility

The project scope is for a new cleanroom manufacturing facility, support and office area of 80,000 sq.ft.
About this project

The project scope is for a new Cleanroom Manufacturing Facility, support and office area of 80,000 sq.ft. DPS were requested at a late stage to join the project and replace an incumbent Architectural and Engineering (A&E). As part of this, DPS re-evaluated the original Basis of Design and then executed the design of all the process systems, cleanroom architectural and cleanroom HVAC & exhaust facilities. DPS has also provided preconstruction services which will migrate to Construction Management services, and is acting as the federated model coordinator for the entire facility.

Process/support systems
  • Spec gases and bulk gases
  • Waste treatment systems
  • Cleanroom HVAC & exhausts
  • Electrical and I&C
  • Life safety toxic gas monitoring systems
  • Cleanroom architectural
  • Schedule development, tender documents, subcontractor awards
  • BIM/ VDC federated model coordination
  • Utility model generation from scratch
Facility features
  • 25,000 sq.ft. Cleanroom (1,000,000 cubic feet) ‘Clean Space’
  • Greenfield site with office and manufacturing support
  • 10,000 sq.ft. future expansion